Limited Time SaleUS$18.04 cheaper than the new price!!
| Management number | 210771750 | Release Date | 2026/04/02 | List Price | US$12.02 | Model Number | 210771750 | ||
|---|---|---|---|---|---|---|---|---|---|
| Category | |||||||||
Worth Garden 5/8 diameter with 50 Ft long is ideal for indoor and outdoor use, especially for gardening, farming activities. High-quality with solid Brass+Aluminum fittings and hybrid materials allows to used for tough watering chores and industrial water in all weather. It resilient built allows this garden hose easy to use in the driveway, garden, to drain a pool for winter, to flush the water heater. The APEX anti-kink technology ensures you to stop wasting water, prolonging the life of the hose to give you a reliable experience. It is a good basic piece to have in your garden.
| Color | Brown |
|---|---|
| Brand Name | Worth |
| Unit Count | 1.0 Count |
| Item Length | 600 Inches |
| Item Weight | 5.36 Pounds |
| Manufacturer | Worth Garden |
| Material Type | Rubber |
| Maximum Pressure | 261 Pound per Square Inch |
| Outside Diameter | 0.63 Inches |
| Included Components | garden hose |
| Item Dimensions L x W | 600"L x 0.63"W |
| Nominal Wall Thickness | 0.625 inches |
If you notice any omissions or errors in the product information on this page, please use the correction request form below.
Correction Request Form